Export & Transmission Pipelines, Process Plant (US/DS - SCE's),
- Design, Project Engineering & Operational Surveillance,
-
Materials Selection (CRA for Sweet/Sour Fluid Services, inc. Coatings),
- CAPEX vs OPEX Material Optimisation (Metallics/Non-Metallics),
-
Fabrication & Installation Surveillance (ITP, RFI),
-
Corrosion & Risk Management (CP, RCFA, ILI, NDT, RBI, IOW, FFS),
- Fluid Conditioning (CI, H2S/O2 Scavengers, Biocides, pH Control),
-
Welding Engineering (WPS/PQR Development & Approval),
-
Shutdown Planning & Management (API/AICIP Inspector Supervision).
Acronyms
AICIP - Australian Institute for the Certification of Inspection Personnel | API - American Petroleum Institute | CAPEX - Capital Expenditure
CI - Corrosion Inhibition | CP - Cathodic Protection | CRA - Corrosion Risk Assessment | FFS - Fitness for Service | ILI - In-Line Inspection
IOW - Integrity Operating Window | ITP - Inspection & Test Plan | NDT - Non-Destructive Testing | OPEX - Operating Expenditure
PQR - Procedure Qualification Record | RBI - Risk Based Inspection | RCFA - Root Cause Failure Analysis | RFI - Request for Inspection
SCE - Safety Critical Element | US/DS - Upstream/Downstream | WPS - Welding Procedure Specification